Export Packing & Installation Handoff store arrangement reference

BENSON PROJECT KNOWLEDGE

Export Packing & Installation Handoff

Plan protection, package codes and site assembly as part of the fixture design.

STEP 01

Choose the assembly state

Compare assembled, partly assembled and flat-pack options using glass size, package handling and the destination team. Easy transport is only useful when the fixture can also be assembled correctly on site.

STEP 02

Protect the vulnerable parts

Define protection for glazing, corners, finished faces and removable hardware. Keep loose parts from rubbing against display surfaces. Identify packages that require a particular lifting or unpacking sequence.

STEP 03

Code the shipment for the installer

Connect fixture codes, carton or crate numbers and the room layout. Include hardware kits, assembly drawings and a clear parts list. For multiple stores, label by destination and installation sequence.

STEP 04

Confirm the destination handoff

Agree the named shipping destination, unloading resources, receiving hours and responsibility for local charges. Confirm who performs wall anchoring, electrical connections and final site checks. Photograph visible damage at receipt and identify affected packages promptly.

PROJECT KNOWLEDGE

Continue Planning Your Project.

START WITH YOUR FIXTURE REQUIREMENTS

Tell Us Which Fixtures You Need.

Share the cabinet type, dimensions, card formats and quantity. We will review display, reserve storage and combination requirements for your quotation.

  • Destination and available width, depth and height
  • Graded cards, singles, sealed products and accessories
  • Cabinet quantity, shelves, locks and lighting options
  • Required schedule, packing and delivery scope